Print

Manufacturing lines

SEAT LIFT

manual assembly line with greasing and testing stations

SOLUTION

seat lift

 

Cycle time: 4 seats/minute (15 sec)
Features: assembly, greasing, testing lifting force, marking for traceability, discharge of NOK parts

 

 

 

 

HANGING RAIL

hanging railhanging rail

component for the furniture industry

SOLUTION

hanging rail

 

Full automatic line manufacturing and palletizing 20 versions of rails from 1 up to 3 meters.

Bending and punching press inside

 

 

CONTROL ARM

automatic assembly line for a component of the car suspension system

SOLUTION

control arm

 

Robot: 6
Arc welding lenght: 150+150 mm (4+4 seams)
Turn table: 1
Cycle time: 40 seconds
Operators: 2 per shift
Parts/Year: 200.000 +200.000 (2 shifts)
Seam welding calibration
Electronic quality checks (calibration, marking, welding)

 

 

Events & Projects

On-going

  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot
  • Ara Robot